Clark Builders successfully completed the design-build contract for the Smelter Recycle Building located at Teck Trail Operations' brownfield site.
The primary objective of the project was to develop a facility that would effectively reduce fugitive dust emissions in the Beach area of Teck Trail Operations.
The construction process involved various disciplines, including earthworks, mechanical engineering, electrical systems, pre-engineered buildings, pre-cast concrete, and cast-in-place concrete.
The project made innovative use of pre-cast foundation walls and a frameless stress skin building, resulting in a significant reduction in the project's overall duration.
Teck Metals Ltd.
121,400 sq.ft.
Design Build
Clark Builders recognizes that we live, work, and build across Canada on the ancestral lands of many First Nation, Métis, and Inuit communities. We also recognize the collective legitimacy of Aboriginal rights and title, and respect the diversity between and among First Nation, Métis, and Inuit across this nation. We value the contributions of Indigenous people as stewards of the lands we share, and we are committed to our role in the journey towards Truth and Reconciliation.
Privacy Policy | Code of Ethics | ©2024 Clark Builders, All rights reserved.